Buttercup Creek Interceptor Tunnel, CIPP Project

Owner: City of Cedar Park

Contact Person: Eric Rauschuber, P.E.

Current Phone Number: 512-282-1275

Completion Date: 2005

Construction Cost: $2,100,000

Project Description:

  • 3,400 linear feet of 36-inch diameter interceptor
  • 2,000 feet 52-inch diameter tunnel.
  • Installation of a flow monitoring station which consisted of a proprietary flow tube installed in a cast in place access vault.
  • Cured in place pipe (CIPP) installation in approximately 200 feet of existing 30-inch ductile iron sewer.
  • Project completed with less than 2 percent change orders.

Project completed on schedule and within budget.

Services Provided:

AEG managed the construction phase services including project reporting, reviewing RFIs, reviewing shop drawings submittals, project reporting, development of opinions of probable cost, construction administration. AEG. responsible for cured in place pipe design, contract document preparation, and construction management.

Cedar Park recommendation letter