Glenlake Water System Improvements, Travis County

Owner: Lower Colorado River Authority

Contact Person: Jason Eichler, P.E.

Current Phone Number: 512-473-3200

Completion Date: N/A

Construction Cost: Estimated $1,500,000

Project Description:

Project included hydraulic modeling and design of waterline in existing neighborhood and associated storage facilities and booster pumping station. The design of the project was completed in the Spring of 2007. Major elements included:

  • Modeling and evaluation of alternatives to meet contractual requirements with the water provider.
  • Approximately 1,000 linear feet of 8-inch water line in existing residential neighborhoods with hot taps to existing transmission mains.
  • 350,000 gallon ground storage reservoir.
  • 1,200 gpm booster pumping station with variable speed drives.
  • 125 linear feet of boring and jacking.

Services Provided:

  • Hydraulic analysis using WaterCad©
  • Evaluation of alternatives.
  • Development of opinions of probable coast.
  • Preparation of plans, specifications and contract documents.

LCRA recommendation letter

<< Previous | List | Next >>